King’s University College Darryl J. King Student Life Centre – LEED Silver
January 1, 2017
Alexandra Hospital Electrical Power Distribution Upgrade
September 19, 2024
Show All

Western University Convergence Centre – LEED Gold

This project was a new $16 million, 6,000 m2 research laboratory. The facility features fume hood exhaust energy recovery, a variable speed centrifugal chiller and cooling tower, low temperature heating system with condensing boilers, premium efficiency motors throughout, variable speed pumping systems, waterless urinals and low flow solar powered plumbing fixtures. Energy costs are 44% lower than a building built to current code requirements. The project was completed in 2010.

Value:

$16 Million

Size:

6,000 m2

Location:

London, ON

Client:

Nicholson Sheffield Architects

Year Completed:

2010

Awards:

LEED Gold